Administrative

Sodic - West (Block36)

Sodic - West (Block36)
  •   Project Name: Sodic - West (Block36)
  •   Owner: SODIC
  •  Consultant:ACE " Moharram Bakhoum Project Management"
  •  Date of implementation: 2020
  •  Location: 6th of October
  •  Project Budget:

Project Main Component:

Supply and install the following systems: 

- HVAC:  Package Units, fans, Duct work, Air outlets, Pipes, Volume & Fire Dampers, Cable Trays.

- Firefighting: Piping System, Sprinklers, Valves, Fire suooression System, Fire Stand pipe Systems, Fire Extinguishers, FM 200 System.

- Plumbing: Piping Systems, Valves.

-Electrical: Ring main units, medium voltage cables, Distribution Transformers, Transformers (1000 KVA), Busbar Trunking, Disconnect switches, Lighting Switches.

- Light Current Works: Fire Alarm System, IP-CCTV System, Stand Alone Access Control System, Structured Cabling System, Network Equipment, Cables.